CALL US: (800) 647-1911

Irving Tissue

By Connor Storer on Dec 17 in Case Study, Manufacturing.

We installed a Roll Handling line in our facility around March 2004.  The system includes seven….VFDs….Unfortunately we experienced about nine drive failures in 10 months which caused a lot of downtime and production issues….In May 2005 we installed TPT surge suppressors for the PLC and the MCC that fed the drives….Since then we had absolutely no issues with the drives or fuses clearing….

Connor Storer

Top